Sunday, May 20, 2007

Ground floor slab laid down


Ground floor insulation

150 mm of insulation laid onto the sand blinding
.
150 mm of insulation slotted in between the inner and outer walls

Radon and damp proof membrane



Radon and damp proof membrane laid down, even though a good shower overnight makes it look like a swimmimg pool

Sunday, April 29, 2007

North & South elevations after week three



Preparing for the ground floor




15 Tons of scalpings arrive and Sol starts cutting the dumper bags for the scalpings to come straight out onto the ground.
A Radon sump has to be constructed within the ground floor, the purpose is to ventilate any gases within the house and direct it out of the building into the open.
Sol is compacting the scalpings with a ' Compacter plate' or its other name called a 'Wacker'

Block works starts for plinth wall



Building merchants 'Civil Solutions' start the delivery of concrete blocks

Foundations `set in concrete`



Foundations set, you can just srtasee the overall shape of the house. The square foundation within the house is the location for the chimney.